{"id":27,"date":"2016-08-11T12:02:05","date_gmt":"2016-08-11T12:02:05","guid":{"rendered":"http:\/\/pd.com.sg\/site\/?page_id=27"},"modified":"2023-12-23T21:55:55","modified_gmt":"2023-12-23T13:55:55","slug":"technical-services","status":"publish","type":"page","link":"https:\/\/pd.com.sg\/site\/index.php\/technical-services\/","title":{"rendered":"Technical Services"},"content":{"rendered":"<p>We offer the following range of services<\/p>\n<p><strong>Power Quality &amp; Load Analysis<\/strong><\/p>\n<ul>\n<li>Investigate unknown breaker\/relay trip issues or equipment damages (overloading, earth fault \/ leakage problems)<\/li>\n<li>Power Quality monitoring &#8211; compliance check on quality of supply against local or international standards<\/li>\n<li>Assess \/ check on level of harmonics in electrical system (harmonics measurement test report).<\/li>\n<li>Power quality impact studies (adding on more non-linear loads?)<\/li>\n<li>Analysis of Power Quality Data (you perform the actual physical\u00a0measurement, we analyze the data for you)<\/li>\n<li>Power Quality reports for submission to SP PowerGrid (pre and post distributed generation \/ Solar PV connection measurements)<\/li>\n<li>Voltage dip Vulnerability Assessment (How vulnerable is your plant to voltage dips?)<\/li>\n<li>Assessment on existing loading profile (Capacity for expansion? Are loads distributed equally across phases? Inrush loads?)<\/li>\n<\/ul>\n<p><strong>Protection Coordination &amp; Arc Flash Studies<\/strong><\/p>\n<ul>\n<li>Ensuring during an abnormal power flow (electrical fault), protective devices react to isolate the problem with minimum disruption to the rest of the system<\/li>\n<li>Fault current analysis, incident energy modelling and calculation, equipment evaluation, arc flash labels<\/li>\n<\/ul>\n<p><strong>Earthing &amp; Lightning Protection<\/strong><\/p>\n<ul>\n<li>Investigate earthing or lightning protection related problems<\/li>\n<\/ul>\n<p><strong>Consulting Services<\/strong><\/p>\n<ul>\n<li>Health Assessment \/ Study of Electrical Assets &amp; Networks, based on age, operating condition, historical fault records and international best practices<\/li>\n<li>Technical advice on development of power quality monitor, power quality analysis software<\/li>\n<\/ul>\n<p><strong>Professional Engineer (PE) \/ Licensed Electrical Worker (LEW) Services<\/strong><\/p>\n<ul>\n<li>Professional Engineer Endorsements \/ Submissions to Authorities (SP, BCA, etc)<\/li>\n<li>Testing, turn-on &amp; liaising with SP Services \/ SP PowerGrid<\/li>\n<li>Grid-Tied Solar PV installations, Energy Storage System (ESS)<\/li>\n<\/ul>\n<p><strong>Contact\u00a0Us at services@pd.com.sg for further details<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We offer the following range of services Power Quality &amp; Load Analysis Investigate unknown breaker\/relay trip issues or equipment damages (overloading, earth fault \/ leakage problems) Power Quality monitoring &#8211; compliance check on quality of supply against local or international standards Assess \/ check on level of harmonics in electrical system (harmonics measurement test report).<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/pd.com.sg\/site\/index.php\/technical-services\/\" class=\"themebutton\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-27","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/pages\/27","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/comments?post=27"}],"version-history":[{"count":15,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/pages\/27\/revisions"}],"predecessor-version":[{"id":161,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/pages\/27\/revisions\/161"}],"wp:attachment":[{"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/media?parent=27"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/categories?post=27"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pd.com.sg\/site\/index.php\/wp-json\/wp\/v2\/tags?post=27"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}